
Main Contractor for Entire Structural Works & Architectural Finishing

CONSTRUCTION OF PARKING FACILITY FOR CIBAO CO., LTD.
Project Name: Parking Facility – Cibao Co., Ltd.
Location: N5 Street, Suoi Tre Industrial Park, Long Khanh City, Dong Nai Province
Client / Investor: Cibao Co., Ltd.
Scope of Contract: Main Contractor for Entire Structural Works & Architectural Finishing
Contract Value: VND 12.7 Billion
Construction Duration: 06 months
Execution Period: September 2015
Contractor: Elip Co., Ltd. (ElipCo)
Detailed Project Description:
The Cibao Parking Facility project is a multi-level auxiliary infrastructure development located inside Suoi Tre Industrial Park, Dong Nai Province. Designed with a highly functional layout, the building efficiently manages vehicle staging and parking for thousands of factory personnel and transport fleets.
Project Scale & Land Specifications:
Land Area: 38m × 60m
Total Gross Floor Area (GFA): 6,840 sq.m
Building Elevation: 1 Basement Level + Ground Floor + 2 Upper Floors + Corrugated Steel Roofing
Structural Engineering & Technical Details:
Substructure: Reinforced concrete isolated footings engineered for cost optimization and structural stability.
Superstructure: Heavy-duty reinforced concrete columns combined with structural steel trusses to provide open circulation spaces for vehicles.
Enclosure & Roofing: 200mm double-brick masonry perimeter walls, capped with high-grade heat-insulating corrugated steel sheet roofing for superior durability.





